Major progress today!  Remember this?

Today, it looks like this. 

Dry wall is in, tile is up, and grouted.  Tomorrow it gets sealed and tomorrow night the shower should be whole.  My only concern is that the issue of the shower curtain rod has not been resolved.  Since my shower only has two walls instead of three, I need a shower curtain rod that turns and covers the other two sides.  Wheeler Dealer Landlady was saying she’d probably have to have one custom fabricated and in the meantime I can just keep using the one that was already here.  That’s fine, except that if the mounting mechanism is different in anyway, then there could end up being extraneous holes in the new marble tile, and that would be tragic.

On a side note, I was hoping this renovation would include building a third side to the shower surround but apparently there isn’t enough space between the tub and the toilet to build the wall and still be code compliant.  Oh well, it was worth a shot.

I probably still won’t be able to use the shower until some time Saturday, but at least we’re making progress on that.  Using the shower at work has been fun, exciting and arousing all at the same time…  But it’s also been a pain in the ass.  There’s just not enough water pressure and I feel a bit exposed there.  I also don’t feel like I’m getting rinsed as well as I like when I’m washing off the soap because of the low pressure.  I have a hand held shower head/massager/do-hickey.  I really like having the control as to where the water is aimed and the intensity of the spray.  The hardest, most focused setting feels pretty damn good while I’m rinsing my sphincter.  Definitely not getting that while I’m using the trickle er, uh– Shower at work.  Wheeler Dealer Landlady has bought some pretty nice fixtures for my new bathroom so I’m going to give those a try before I go back to my hand held shower head but I assume even the new shower head she bought will have more pressure than this thing at work.

I’m a firm believer that every good day starts with a good wank, so I took advantage of the unusual circumstances with the shower at work again.  I gotta say, I doubt that I’m the only guy who has used that shower and has jerked off while there.  The really kinky, nasty side of me really got off on the idea that I was just adding to the… shall we say, gene pool.  Of course I’m sure the shower has been cleaned since the last time someone besides me rubbed one out in there, but it adds to the fantasy, I guess.  And speaking of fantasies…  My Fantastical Engineer, played a role again this morning.  He’s an Asian man.  He shaves his head.  And he’s about 8 inches shorter than I am.  I fantasized this morning about him servicing me.  Using his mouth to bring me to the brink, and then putting some time into my…  Undercarriage seems like a good word…  And while he was doing that, I jerked it till I came, blowing my load all over his smooth, freshly shorn head.  What a blast!  Too bad he wasn’t there to enjoy it!

Hmmm.  I seem to have gotten a bit side tracked…  Albeit a good side track.

So where was I…  Ah yes, the bathroom.  I’m thrilled with the progress Adorable Little Contractor has made today.  It feels like things are really starting to come together now.  I narrowed down my paint selections today.  There are three options of three different shades that I’ve narrowed it down to.  It doesn’t show up very well, but the sample in this picture is the most likely choice at this point. 

I’m not especially thrilled that the border pieces of the tile are far whiter than the squares, but I don’t guess there’s anything to be done about it now.

It’s not terrible but it’s not great either.  Maybe it’ll stand out less once the project is done.

The paint sample is called Livingston Olive, a light olive color.  I was not at all sure about it at Home Depot, and when Unsvelt Girl and I went to the Expo today to look at the samples against the console, it was the third choice and Unsvelt Girl thought it was too yellow.  I ended up having to come by the house right after that (Scared Kitty, somehow liberated himself from the kitchen and I had to rectify the problem.)  While we were here, I taped the samples up to the wall.  Next to the tile and in the natural sunlight it was a completely different color.  It was suddenly first choice!

Moving on.  Remember this?  Today, it looks like this… 

The medicine cabinet is also coming out.  There will be a larger mirror over the vanity and there will be a second outlet on the other side of the vanity.  The new vanity is taller than the old one but the back splash will be standard four-ish inches above the surface.  So there will be some wall repair to be done.

The next obvious step for this area is to tile, grout and seal the floor before Adorable Little Contractor can bring in the new vanity and hook up the plumbing.  The other two paint samples are in the top right corner of this picture, and while you can’t get a great look at those either, you can see that they are darker than the first choice.  The real deciding factor will be when the floor is done and the vanity is in.  The tile on the floor and the slab on top of the vanity are all the same as the shower so between that and the large window, I’d think there’d be a lot of light, however, the vanity is a dark stained wood….  Decisions, decision…

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: